Sign In | Join Free | My disqueenfrance.com |
|
Brand Name : HOOHA
Model Number : 1000/1250/1600
Certification : CE/ISO
Place of Origin : Guangdong
MOQ : 1 unit
Price : negotiable
Payment Terms : L/C, T/T
Delivery Time : 45 working days
Packaging Details : PE foam
application : twist
cable size : 5mm-35mm
loading weight : 2000/3000/4000
motor power : 44/55/75 KW
Back twist motor : 11/15/18.5 KW
Export : 12 years
HS Code : 8479400
bobbin : 1000/1250/1600
technical : program,install,training,operate
CLY Cradle Cable Laying Up Machine For Power Cable , ASCR Cable , ABC Cable
Application:
Laying up machine is mainly used for the cabling of power cables or control cables,and the stranded cables may be round or fan-shaped cables.Laying up machine is mainly composed of pay-off racks, stranding cages, die holder, wrapping equipment, steel wrapping device, meter counter, casptan, take-up & traverse rack, transmission system and electrical control system.
Specification
Type | CLY-1000 | CLY-1250 | CLY-1600 |
Wire cross-section (mm²) | 6-150 | 30-240 | 50-300 |
Stranding die (MAX) (mm) | Φ60 | Φ80 | Φ100 |
Cage rotation (rpm) | 20-45 | 13.6-32.1 | 5.9-14.1 |
Stranding pitch (mm) | 94-1550 | 183-3213 | 324-5893 |
Taping rotation (rpm) | 171-380 | ||
Taping pitch (mm) | 11-178 | 16-256 | 12-202 |
Armoring rotation (rpm) | 153-340 | ||
Armoring pitch (mm) | 12-207 | 18-293 | 14-238 |
Capstan wheel (mm) | Φ1600 | Φ2000 | Φ2500 |
Capstan line speed (m/min) | 4.22-30.96 | 5.9-43.7 | 4.6-34.8 |
Bobbin in the cage | PN1000 | PN1250 | PN1600 |
Central payoff bobbin | PN800-PN1600 | None | |
Take-up bobbin | PN1000- PN2000 | PN1250- PN2500 | PN1600-PN3150 |
Main motor (KW) | 44 | 55 | 75 |
What does your company guarantee for machines if we buy it ?
1. We guarantee to offer new advanced goods.
2. We'd like to send skilled personnel to the installing place to help offer technical consultant, quantity estimation and instruction,installing, preliminary testing,and help start up running; and to answer for any defect of the product found in installing and run testing,If there's something wrong with the product, we'll give our answer within 12 hours and get to the spot within 36 hours.
3. After installation,We'll send skilled personnel to have the preliminary test and answer for any problems emerged. We take the whole charge of the fee needed in repairing,testing or retesting within the scope of our duty required in contract.
4. During the contract's period of validity,of the project must be started all over again or the goods can not be used at all which is resulted from our faulty goods and improper files or mistakes made by our instructors, we'll change the goods at once without compensation and take charge in all expenses of re-installation
![]() |
CLY Cradle Cable Laying Up Machine For Power Cable ASCR Cable ABC Cable Images |